dining room, house, living room

Front of the House: To Do

We’re in the process of renovating our living room & dining room, and plan to finish up our entryway and hallway soon too. Basically, the whole (interior) front of the house will be fixed up, except the kitchen, which we’re saving for sometime in 2016.

So, to better keep track of it all while we finish up, I’m posting a list so I can cross things off and keep track of everything. (Yes, this list seems really long since we’ve already made some big changes, but… well, there’s more to do!)

Living Room:

  • Add sectional. (Delivery should be soon!)
  • Finish up & paint built-in bookcases white.
  • Touch up grey paint on fireplace around mantel.
  • Install & paint trim around small doorway.
  • Paint & install baseboards.
  • Add new rug + rug pad.
  • Move coffee table & TV stand back into living room.
  • Set up TV stuff & surrounded sound.
  • Move books onto bookcases.
  • Decorate the fireplace/mantel.
  • Setup fireplace stuff (tools & log storage).
  • Add sliding barn doors at large doorway (or trim only — still deciding.)
  • Plan/shop for/hang wall art.
  • Install curtains/panels at sliding door.
  • Shop for console table & an end table.
  • Shop for chair for near sliding door/fireplace corner.

Entryway:

  • Pick out tile & have installed, along with baseboards.
  • Paint & install new coat closet door, including new hinges & knob.
  • Have painters minimize texture/repair, then paint.
  • Clean out & organize closet.
  • Replace overhead light.
  • Hang mirror or artwork.
  • Update light switches.

Dining Room:

  • Move out the temporary living room setup, so it can be a dining room.
  • Add dining table. (Delivery later this month!)
  • Order dining chairs.
  • Create coffee bar. (This will require its own to do list soon.)
  • Hire electrician to move overhead light & add outlets.
  • Install two curtain rods & hang two layers of new curtains.
  • Move sideboard into room & setup.
  • Plan/shop for wall art.

Hallway:

  • Have painters repair texture where needed & paint.
  • Paint new linen closet doors & add knobs.
  • Replace all doors, including hinges & knobs.
  • Hang gallery wall of photos.
  • Replace overhead light.
  • Replace doorbell.
  • Update light switches.

Whew. We’ve got work to do, but it’s going to be great.

Once we’ve got lots of these things handled (and before we move onto the kitchen), we’re going to get to work on remodeling the master bathroom and finishing up the master bedroom. So, stay tuned! 😀

1 Comment

  1. Pingback: Front of the House: Updated To Do | Sarah B.

Comments are closed.